welshobitt
10-30-2007, 04:40 AM
Hello,
Can anyone help me? :help
I have to backdate very quickly a report with roughly a years worth of CSV files produced daily.
I 'm basically looking for a quick way that these files can be imported into one spreadsheet, but opens them in turn and in order so that a date can be entered to show the date the file was produced in one of the spare available columns.
Can this be done:think:
Can anyone help me? :help
I have to backdate very quickly a report with roughly a years worth of CSV files produced daily.
I 'm basically looking for a quick way that these files can be imported into one spreadsheet, but opens them in turn and in order so that a date can be entered to show the date the file was produced in one of the spare available columns.
Can this be done:think: