02-14-2008, 04:40 AM
Hi,
Im buidling a risk tool which is using critical path analysis using vba in excel, i have set up the network, im having problems drawing and position the nodes and activities in the right order
i can send you the excel document, im also willing to pay via paypal
thanks
Im buidling a risk tool which is using critical path analysis using vba in excel, i have set up the network, im having problems drawing and position the nodes and activities in the right order
i can send you the excel document, im also willing to pay via paypal
thanks