AmandaMarie
05-25-2005, 11:36 AM
I have a spreadsheet that I need to fix.
The attached file is all messed up.
The finished product should have 2 columns as it does now. Except it should both be in PST time zone. Right now the right most column is in EST time zone.
Any quick fix out there?
Thanks so much for helping!
Amanda
The attached file is all messed up.
The finished product should have 2 columns as it does now. Except it should both be in PST time zone. Right now the right most column is in EST time zone.
Any quick fix out there?
Thanks so much for helping!
Amanda