jack nt
09-04-2011, 01:16 AM
There is a very simple way to know when ask Day("1/2/2003") = ?
If Day("1/2/2003") = 1 then Control Panel is of "d/m/y"
ElseIf Day("1/2/2003") = 2 then Control Panel is of "m/d/y"
Jack NT
If Day("1/2/2003") = 1 then Control Panel is of "d/m/y"
ElseIf Day("1/2/2003") = 2 then Control Panel is of "m/d/y"
Jack NT