PDA

View Full Version : Creating a curve graph to show negative position to positive position



winfy
08-31-2016, 12:56 AM
Hi all,

I am trying to create a model that includes a line graph that shows at the start of the project, the project position is usually negative and becomes more negative up to a point in time when it starts to provide financial return and you get to a point where the financial return is still increasing but flattens out.

The vertical axis is the cost ($) and the horizontal axis is time (t).

The variable that controls the direction and slope of the line graph is resources and scope of work. Does anyone know how to do this?

Thanks