ozibryan
04-04-2006, 04:59 AM
The master sheet contains a number of values that may be updated by either the update or refresh sheets as this information is available.
When applying the update sheet the following needs to occur:
When the sheet, Update Exchange value matches the master Exchange value the corresponding Capacity value needs to be reflected within the master,. An example is the Master capacity value for ABCF7 "after update is applied".
Additionally, the following events are needed when applying the Refresh sheet to the Master::
When an exchange on the Refresh sheet matches the Master exchange, the Refresh Upgrade value is applied to the Master Projected value for the corresponding exchange.
This would be subsequently added to capacity within the projected date column as per ABCF7 & ABCDA1 examples.
I hope this gives a bit more clarity to the problem I am trying to resolve. Please let me know if I can explain this with more clarity
When applying the update sheet the following needs to occur:
When the sheet, Update Exchange value matches the master Exchange value the corresponding Capacity value needs to be reflected within the master,. An example is the Master capacity value for ABCF7 "after update is applied".
Additionally, the following events are needed when applying the Refresh sheet to the Master::
When an exchange on the Refresh sheet matches the Master exchange, the Refresh Upgrade value is applied to the Master Projected value for the corresponding exchange.
This would be subsequently added to capacity within the projected date column as per ABCF7 & ABCDA1 examples.
I hope this gives a bit more clarity to the problem I am trying to resolve. Please let me know if I can explain this with more clarity