Howdy,
I have a worksheet that has a shiznit load of array formulas (has to be this way). I have the calculation turned to Manual and fire a sheet recalc when necessary (it takes 3 mins approx). Is there a progress bar that I can show during the recalc? The problem is it is easy to break the recalc by simply clicking in the sheet before the sheet has updated fully.
Any other thoughts would be greatly appreciated too.
:beerchug:
I have a worksheet that has a shiznit load of array formulas (has to be this way). I have the calculation turned to Manual and fire a sheet recalc when necessary (it takes 3 mins approx). Is there a progress bar that I can show during the recalc? The problem is it is easy to break the recalc by simply clicking in the sheet before the sheet has updated fully.