Consulting

Results 1 to 3 of 3

Thread: Solved: Anyone Bored? VBA Project. Tucson?

  1. #1
    VBAX Newbie
    Joined
    Mar 2008
    Posts
    3
    Location

    Solved: Anyone Bored? VBA Project. Tucson?



    I took on this project at work and quickly realized that it requires knowledge far past mine concerning VBA. I was able to complete portions of it with excel formulas but have run into some road blocks. I have created a sanitized version if you will of the Matrix that we start with and then using that sanitized data created the format that will basically be the endstate (or success).

  2. #2
    Distinguished Lord of VBAX VBAX Grand Master Bob Phillips's Avatar
    Joined
    Apr 2005
    Posts
    25,453
    Location
    Do I get flights over and accomodation as well as a decent remuneration?
    ____________________________________________
    Nihil simul inventum est et perfectum

    Abusus non tollit usum

    Last night I dreamed of a small consolation enjoyed only by the blind: Nobody knows the trouble I've not seen!
    James Thurber

  3. #3
    Site Admin
    Urban Myth
    VBAX Guru
    Joined
    May 2004
    Location
    Oregon, United States
    Posts
    4,940
    Location
    Ooh, I'll second that. Sum(time,expenses,rates)

    Moved to appropriate forum.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •