Consulting

Results 1 to 5 of 5

Thread: Solved: List help

  1. #1
    Moderator VBAX Master Tommy's Avatar
    Joined
    May 2004
    Location
    Houston, TX
    Posts
    1,184
    Location

    Solved: List help

    Another one I inherited.

    In cell F2,F3,F4 I have what I believe is a list. I can't change the source to it at all. The list is coming from Q35. I can change the contents but I want the contents of U35-U65 to be in the drop down list. I tried the design view no worky. I think I have so much difficulty because I use a RPN calculator.

    I asked the guy that wrote it, he forgot and can't figure it out either.

  2. #2
    Distinguished Lord of VBAX VBAX Grand Master Bob Phillips's Avatar
    Joined
    Apr 2005
    Posts
    25,453
    Location
    It is Data Validation. Select the cells, goto Data>Validation, and change the source.
    ____________________________________________
    Nihil simul inventum est et perfectum

    Abusus non tollit usum

    Last night I dreamed of a small consolation enjoyed only by the blind: Nobody knows the trouble I've not seen!
    James Thurber

  3. #3
    Moderator VBAX Master Tommy's Avatar
    Joined
    May 2004
    Location
    Houston, TX
    Posts
    1,184
    Location
    Thank you so much.

    Now I can fix the formulas that I messed up trying to fix that.

    Thanks so much, you would not believe how much that helped!!

  4. #4
    Moderator VBAX Wizard lucas's Avatar
    Joined
    Jun 2004
    Location
    Tulsa, Oklahoma
    Posts
    7,323
    Location
    Hi Tommy, must have been an okie that put it together...after the game with texas last week I'm starting to think we can't do anything right.
    Steve
    "Nearly all men can stand adversity, but if you want to test a man's character, give him power."
    -Abraham Lincoln

  5. #5
    Moderator VBAX Master Tommy's Avatar
    Joined
    May 2004
    Location
    Houston, TX
    Posts
    1,184
    Location
    Hey Steve,

    I don't think he is an okie. He is ex-navy by way of MI through LA. In case you can't tell that is my screw count page. That was all it was when I got my grimey little hands on it.

    I enter the building information on it and it tells me how many screws, clips, how much tape seal .... that goes into the building. I can enter the infomation in about 5 minutes. It saves about an hour or more. I have my detailers starting to use it and now we are all on the same page

    I have had to go to college ball, the pro team here leaves a lot to be desired. LOL

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •