Consulting

Results 1 to 2 of 2

Thread: Move (reposition not reschedule) task with VBA

  1. #1
    VBAX Newbie
    Joined
    Feb 2012
    Posts
    3
    Location

    Move (reposition not reschedule) task with VBA

    Is there a way to Mage a task in the outline structure so it is now in a different position (similar to drag-n-drop)? I know I can SelectRow, EditCut, & EditPaste, but that actually creates a whole new task with a new Unique ID.

  2. #2
    VBAX Newbie
    Joined
    Feb 2012
    Posts
    3
    Location
    Is there a way to *move* a task.....
    Auto-correct got me.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •