Hi ,
Sorry for the late reply.
thanks for the proposal SamT. In fact the sheet that i have send is the sheet where the calculation is being done. The end presentation to the user is very much simpler and very user friendly . As before the calculation is ready we need to check each parameters date like the fabric, Ok prod, trims date, etc. and also to calculate the mins based on the efficiency and the minimum qty set per day and its just after all these calculations are done the all data are sent to this sheet for the main planning events to occur.
After that all these calculated data are sent back the end user sheets to show how each order and there dept has been planned and if all dates are on target and if not its highlight the dept so that the user can easily see the orders which are in danger of delivery.
All the other parts of the calculation takes almost 10 - 12 secs to occur and the only one that take a lot of time is the one that i have sent which takes almost 52 -65 secs.
So for every analysis that a user will do like changing the minimum qty per day or changing the efficiency of the specific dept he will have to wait 12+ 65 = 77 secs to see the analysis results which is very time consuming.
if you want i can send the complete file but due to the size and seeing where i am having the problem that is why i have send only the part that am really block.