Consulting

Results 1 to 2 of 2

Thread: Sleeper: Data Validation List(s)

  1. #1

    Sleeper: Data Validation List(s)

    I currently have two data validation list referenced against the days of the month.

    When the main list is changed, data within the worksheet is changed to reflect that day.

    I need the second list to automatically default to 7 days prior when the 1st list is changed. I still need for the user to be able to change the second list; however, when ever the 1st list is changes, the second list will again automatically default to 7 days prior.

    Thanks for any help.

    -ep

  2. #2
    Distinguished Lord of VBAX VBAX Grand Master Bob Phillips's Avatar
    Joined
    Apr 2005
    Posts
    25,453
    Location
    Quote Originally Posted by inked
    I currently have two data validation list referenced against the days of the month.

    When the main list is changed, data within the worksheet is changed to reflect that day.

    I need the second list to automatically default to 7 days prior when the 1st list is changed. I still need for the user to be able to change the second list; however, when ever the 1st list is changes, the second list will again automatically default to 7 days prior.

    Thanks for any help.

    -ep
    Just 7 days prior, or 7 before and upto that date, or maybe something else?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •