Quote Originally Posted by almouchie
I have 3 shifts( A, B, C) that cover 24 hours a day.

On fridays, Satur, Sunday only 2 shifts are required
2 out of three shift need to work no less than 60 hours a week
& the other one(C) no less than 48 hours
Please clarify what happens on Fri/Sat/Sun. Do you still ned 24-hour coverage those days (in which case the assigned shifts have a longer duration than on other days), or are you allowed to scale back coverage?

Patrick