View Full Version : MS Project
- [SLEEPER:] Dim aem?? (2 replies)
- [SLEEPER:] Sending MS Project task to Outlook as an appoitnment in a custom calendar (1 replies)
- [SOLVED:] MS Project Custom Fields Formula calculate start in timezone with daylight saving (4 replies)
- VBA Excel Application Not opening (1 replies)
- As Soon As Possible / As Late As Possible switch for all activities (3 replies)
- [SOLVED:] Crashing project activity duration VBA macro (3 replies)
- Create email with attachment from sharepoint (0 replies)
- Issuing a Digital Certificate (0 replies)
- [SOLVED:] How can i save the highest Unique task ID in a project level custom field. (2 replies)
- [SOLVED:] ExportAsFixedFormat problem not work (1 replies)
- [SOLVED:] How do I write code to perform a function on dynamic cell range? (0 replies)
- web api vs web scraping (5 replies)
- Unable to get the Vlookup property of the worksheetfunction class (1 replies)
- [SOLVED:] Fill first Empty cell in column When second column has an entry inserted (1 replies)
- Automatic Population of Actual Duration Field (2 replies)
- Compare and copy data (0 replies)
- [SOLVED:] How to unhide password protected worksheet in excel using VBA or something (1 replies)
- How to access separate module macro from different project (2 replies)
- [SLEEPER:] Saving a project file using vba (4 replies)
- Target to Cost Question (1 replies)
- [SLEEPER:] VBA Project issue for countif function (0 replies)
- [SLEEPER:] Time Tracking with value of 1 or zero in column 0900 to column 0800 (0 replies)
- [SLEEPER:] MS Project Pro 2016 Macro Help (0 replies)
- Getting Title from Header (0 replies)
- Absolute/relative reference (0 replies)
- [SLEEPER:] how to associate a drop down box to multiple equations (0 replies)
- [SLEEPER:] How to clear all blank in the cell for the whole worksheet (2 replies)
- how to read Microsoft project content row by row (0 replies)
- MS Project help (0 replies)
- [SLEEPER:] Need Help on SelectTaskField Row (0 replies)
- [SLEEPER:] find, copy, paste (0 replies)
- [SLEEPER:] VBA Help needed for MS Project (0 replies)
- [SLEEPER:] Ribbon onLoad and access to the Ribbon Object (0 replies)
- Using the findex return value (0 replies)
- [SLEEPER:] Get image from Ressource Object (0 replies)
- Open new PPSM from current PPSM (0 replies)
- how to make excel vba project unviewable (1 replies)
- Can't edit macro, VBA project is unviewable (1 replies)
- [SLEEPER:] Do nested loop, Find the host number in every cell and then paste (0 replies)
- Looping through named range and matching data (0 replies)
- Import Wizard prevents Excel code from opening MS Project file. (1 replies)
- VBA Macro (1 replies)
- MS Project 2013 2016 (0 replies)
- Change From Google Translate to Bing Microsoft Translator (0 replies)
- [SLEEPER:] Userform help (8 replies)
- [SLEEPER:] Error handling of setting successor or predecessor not working (0 replies)
- Automate copy,clear,paste in VBA (0 replies)
- can any one help on moving subfolders via vba (0 replies)
- Macro help (0 replies)
- Assignment help (1 replies)
- VBA Code Email out of Project (how to get information from additional text fields) (0 replies)
- VBA to generate Wizard to update Resource List from Excel (0 replies)
- [SLEEPER:] opening access database from network took so long. (0 replies)
- [SLEEPER:] MS Project 2013: How to create an Add-In (exe, dll) (1 replies)
- Calling Function from Module to Form got an error Variable not set (1 replies)
- MS Project - VBA code to lookup precessors from an external file (0 replies)
- Using Trim, LTrim, RTrim in MS Project (0 replies)
- Create a filter and add Active=Yes as test criteria using VBA macro (0 replies)
- Macro callback not working on XML custom tab (0 replies)
- Waiting Function, How? (1 replies)
- run-time error '5941': the requested member of the collection does not exist. (0 replies)
- VBA Script to Split Tasks automatically (0 replies)
- Macro opening more links from cells at a time (0 replies)
- [SLEEPER:] Add Comments on calendar from other sheet (0 replies)
- Export resource list with start and end times per day (shifts) (0 replies)
- Exporting an MS Project Schedule to Excel (0 replies)
- Execute a Macro when file saved (0 replies)
- Macro to add a set of tasks each time I work on a new purchased part (1 replies)
- VBA Help please! (0 replies)
- Buttons to keep track of missing items (0 replies)
- Expand all in web page (0 replies)
- Identify last task(s) edited for error checking (0 replies)
- Chart Legend randomly displayed in exported PDF file (1 replies)
- Loading Chart into Userform Failed (0 replies)
- Put into clipboard some hyperlink (0 replies)
- export information from MS-EXCEL to MS-Project. (0 replies)
- Create hyperlink to MS Project tasks (0 replies)
- Color code entire task row based on text in a certain column (3 replies)
- Opening a .DLL file in a VBA Project (0 replies)
- MS Project Tasks Extraction into Excel (0 replies)
- Change event code to copy range from two sheets to different ranges in Master sheet (0 replies)
- vba code for index & match (0 replies)
- MS WORD 2013 VBA UserForm Error Help (1 replies)
- Test if Calculation Needed in VBA (Manual Calculation Turned On) (0 replies)
- [Help] VBA to modify the content of a text file. (0 replies)
- MS Project Copy to Excel issue (1 replies)
- Looping thorugh all tasks fails after task deleted (2 replies)
- Gantt chart bar formatting (0 replies)
- MS Project to PowerPoint VBA (0 replies)
- transfer project planning from excel? (2 replies)
- How to turn cursor to hourglass from MS Project 2010 VBA (2 replies)
- Insert SubProject after Task x? (Linking ConsolidateProjects to Task) (0 replies)
- User prompt to select a directory when exporting an Excel file from MS Proj (1 replies)
- [SOLVED:] Group Info (6 replies)
- Update issues from excel file (0 replies)
- Run Time Error 424, help defining objects (0 replies)
- Filldown in Gantt Chart view using VBA (0 replies)
- Find and Link Tasks in VBA (1 replies)
- VBA to use all projects in folder as subprojects (14 replies)
- [SOLVED:] Recover a project file (4 replies)
- VBA - To have multiple private sub in a worksheet (2 replies)
- VBA - Replace word with a condition (0 replies)
- Edit Predecessors in Ms Project (1 replies)
- Create Column for Each Resource (0 replies)
- Saving a backup copy of Project file to a specified path in VBA (2 replies)
- Resource analysis (4 replies)
- How to calculate the daily number of people (0 replies)
- ms project vba get data from Field (5 replies)
- Need Help:-Date Difference (5 replies)
- Application.Date Formulas - How to load Task Calendars? (0 replies)
- Select Case only running one sub scenario (3 replies)
- MS Project 10 - Change task line colour (0 replies)
- NEED CODE TO EXPORT EXCEL DATA TO PROJECTS (1 replies)
- MACRO TO LINK EACH RESOURCE NAME (5 replies)
- find values in msproject and replace with values in excel (2 replies)
- Copying entire task row after finding specific value (1 replies)
- Automatic flag indicator when changing a field (0 replies)
- Tasks Disappearing (0 replies)
- Repetitive activities, but specific metadata (MS Project VBA) (0 replies)
- [SLEEPER:] Selecting blank row/cell after last task (0 replies)
- Formatting Milestones (1 replies)
- Building Master Gantt from subprojects (0 replies)
- [SOLVED:] Alert before export (0 replies)
- Import values for "Work" field from Excel (0 replies)
- Need code help for highlighting rows with If statement (2 replies)
- Ltrim macro working, yet throwing Error 91 (Object variable not set) (2 replies)
- How to make the values in a larger Font for the cells with datavalidation? (0 replies)
- VBA issue in WIN7 (7 replies)
- MS Project to detect task level changes and record a date modified in custom field (0 replies)
- Keyword Accuracy Macro Required (0 replies)
- Help on looping macro code and not repeating myself (1 replies)
- What is Internet Explorer_TridentDlgFrame (3 replies)
- Import data from excel to a label in powerpoint (1 replies)
- worksheet change? (0 replies)
- Use formula in enterprise custom field (0 replies)
- Textbox problem (0 replies)
- Supress File Open Dialogue box when opening MS Project file (MPP) in VBA (0 replies)
- Outlook appointment deletion from MS Project (0 replies)
- Download Directory from FTP Server (0 replies)
- Lookuptable help... (2 replies)
- Weighting. (0 replies)
- Help to VBA - Combo Box and Command button (0 replies)
- error (5 replies)
- MS-Project edit without Add-In?! (0 replies)
- Copy Working Hours from Excel into Project (1 replies)
- Move (reposition not reschedule) task with VBA (1 replies)
- Could not load an object because it is not available on this machine (0 replies)
- VBA - Excel 2003 When i use vba Modeless form , textbox loose focus on exit event (0 replies)
- Applying actual work on specific dates (0 replies)
- Need Help Exporting dates from Excel into MS project (0 replies)
- Looking for some help with warehouse Stock replenishment worksheet VBA (0 replies)
- Multiple Filters with "or" (1 replies)
- Task Indicator Needed - All predecessors complete y/n MS-Project 2010 (0 replies)
- Convert DOS commands to VBA code... (2 replies)
- Going Crazy... (1 replies)
- vba code needed to extract ole object of type "Package" from word doc (0 replies)
- Using MS Project Personalized field (0 replies)
- VB Code to extract SQL data on Excel (0 replies)
- Open applications inside citrix (0 replies)
- VBA Macro lookup help needed (0 replies)
- Cost Rate Table Macro (0 replies)
- Looping through tasks (0 replies)
- Copy and paste in VBA (0 replies)
- VBA to Format GANTT bars once rolled-up. (1 replies)
- filling down data as text or numbers from the parent tasks (0 replies)
- column width & text alignament in cells (0 replies)
- Differences based on Computer (0 replies)
- code for near critical activities !! (4 replies)
- Macro to change colour of date field (0 replies)
- help - copy tasks to other file (3 replies)
- question about ODBC (0 replies)
- Trying to Load a Form with a Add In Project 2010 (0 replies)
- MS Project InteropServices ComException (0 replies)
- Word automation using vsto (0 replies)
- Launch a User form from Project (0 replies)
- link subform in an .adp file (0 replies)
- Solved: ADO error: syntax error or access violation (0 replies)
- Having trouble creating a custom entity class(object) (0 replies)
- MS Project Application.FileDialog (3 replies)
- Macro combining pages into one failed to pick up all figures in all pages (0 replies)
- Read all rows in combined Project file (2 replies)
- Solved: Need help with a tricky macro! (0 replies)
- Linking Contact list and tasks from Outlook into Access (0 replies)
- Question about resources (2 replies)
- Calendar Defaults (0 replies)
- Solved: Why does res value stay at 1? (7 replies)
- How Split a 2nd row bar? (0 replies)
- time field for pivot table report (0 replies)
- Excel functions in project (0 replies)
- Custom fields cash flows report (0 replies)
- runtime error 1100 when attempting to paste (1 replies)
- Opening an Enterprise Template with VBA (1 replies)
- Using variable for "Name:=..." (0 replies)
- Format of the Cell needs to be Text type using Visual Basic (8 replies)
- Dropdown list in MsgBox (Macro Ms Project) (0 replies)
- Copy view to excel (0 replies)
- Task Usage Export (0 replies)
- Variable Custom Field Formula (0 replies)
- "Hiding" part of timelime (0 replies)
- VBA Beginner Help - Format Gantt Bars (1 replies)
- Solved: Best Book for learning VBA ? (8 replies)
- Solved: Exporting Data to Excel for reporting purposes (2 replies)
- Solved: Exporting Project 2007 Gnatt view to Excel (5 replies)
- Create MS project file from excel (15 replies)
- trouble copying grouped resource usage data to excel with VBA (1 replies)
- trouble copying grouped resource usage data to excel with VBA (1 replies)
- Solved: Converting Toolbars/Menus from 2003 to 2007 (3 replies)
- VBA newbie need help on error (2 replies)
- Solved: VBA IF statement condition issue (2 replies)
- How to Create/Insert Empty Rows With Cell OnChange Method (1 replies)
- Contract - VBA Developer - MS Project (1 replies)
- Notifying users that Macro's need to be Enabled (0 replies)
- Make view/table visible (2 replies)
- Task calendar (0 replies)
- Resetting Task.Start date to 8:00 AM (0 replies)
- Exporting to Excel (1 replies)
- Copy Task Start and Finish to Excel (4 replies)
- Unable to add more than one reference at a time in VBA in MS Project (1 replies)
- [SOLVED:] Compare two versions of a Project file (4 replies)
- New Risk Analysis Program for MS Project (0 replies)
- Lots of VBA - timescaling/zoning the Network Diagram, risk analysis, other stuff. (3 replies)
- Loop question (1 replies)
- Help to make VBA Excel File in to Application (1 replies)
- Sorting using VBA (4 replies)
- Sorting an Active Spreadsheet by Number (1 replies)
- [SLEEPER:] file save macro (1 replies)
- Page break macro (1 replies)
- Creating a list of predecessors for each milestone (2 replies)
- Solved: Copying Custom Column/Fields to SubProjects (1 replies)
- help to Develop a Leave Planner in VB (2 replies)
- MS Project VBA - How to find only the tasks in a filter (1 replies)
- Reading excel sheet (1 replies)
- Solved: open a MSP file in excel (3 replies)
- Seek Urgent Help On VBA Maro For MS-Project For Calulating The Percentage Completion (1 replies)
- [SOLVED:] Need help in searching last occurrence of string in text file (2 replies)
- How can i count the number of working days between 2 dates (4 replies)
- Customized Predecessor and Successor fields (0 replies)
- Button for displaying a password protected hidden worksheet?? (1 replies)
- [SOLVED:] Defining a Textbox in a form (1 replies)
- Solved: Form highlight and GoTo with a command button (0 replies)
- How to check if the field is hidden? (1 replies)
- If Statements With Mutiple Inputs And Multiple Outputs (31 replies)
- Converting QuickBasic functions to VBA functions (8 replies)
- Checking project data (1 replies)
- Solved: VBA Printer.Print (6 replies)
- Disabling columns in Project (1 replies)
- Export to excel for each resource (3 replies)
- MS Project VBA help- Open MS Project Files (2 replies)
- Trying to Launch .chm File From Toolbar (0 replies)
- Toolbar comming up with specific MS project (1 replies)
Powered by vBulletin® Version 4.2.5 Copyright © 2025 vBulletin Solutions Inc. All rights reserved.